How to Fill Out a Building Permit Application

There is no national permit form. Each city or county building department prints its own, and one remodel can mean separate building, electrical, plumbing and mechanical applications, each with the same owner, address and license numbers.

The model code text behind many of them is short. Under the 2024 IRC, the application has to describe the work, locate the property, state the use, come with plans, state the valuation, and be signed by the applicant or an authorized agent R105.3. This page covers what that looks like on a real form, the boxes that hold people up, and how to fill your department’s own PDF online, scanned or not.

Our two-page worksheet collects all of it once per job: property, owner, contractor, design professional, bond and lender, scope, valuation by trade and subcontractors. It is not an application. Fill it, then copy from it into the form your department accepts.

Download blank PDF
Building permit application worksheet, page 1: property, owner, contractor license and insurance, design professional, bond, lender and notice of commencement
Page 1 of our worksheet. Page 2 has the scope, size, valuation by trade, subcontractors and attachments.

Do you need a permit at all?

The model codes start from yes. Anyone who intends to build, enlarge, alter, repair, move, demolish or change the occupancy of a building, or to install, alter or replace an electrical, gas, mechanical or plumbing system, "shall first make application to the building official and obtain the required permit" IRC R105.1 IBC 105.1.

The 2024 International Residential Code covers detached one- and two-family homes and townhouses up to three stories R101.2. Its list of work exempt from a permit is short. The main items R105.2:

Building

  • One-story detached accessory buildings up to 200 sq ft, other than storm shelters
  • Fences up to 7 ft high
  • Retaining walls up to 4 ft, measured from the bottom of the footing, unless they support a surcharge
  • Sidewalks and driveways
  • Painting, papering, tiling, carpeting, cabinets, countertops and similar finish work
  • Decks up to 200 sq ft that are no more than 30 in above grade, not attached to the house, and not serving the required exit door
  • Prefabricated pools less than 24 in deep; swings and playground equipment
  • Window awnings that project no more than 54 in and need no extra support

Electrical

  • Replacing a breaker or fuse with one of the required capacity in the same location
  • Reinstalling receptacles, but not adding the outlets for them
  • Listed cord-and-plug temporary decorative lighting
  • Wiring and equipment under 25 volts that cannot supply more than 50 watts

Plumbing

  • Stopping leaks and clearing stoppages
  • Pulling and resetting a toilet, as long as no valves, pipes or fixtures are replaced or rearranged
  • Not exempt: replacing a defective concealed drain, waste, vent or water pipe. That is new work and needs a permit and inspection.

Mechanical and gas

  • Portable heaters, fans, cooling units and evaporative coolers
  • Replacing a minor part that does not change the equipment’s approval or make it unsafe
  • Self-contained refrigeration with 10 lb of refrigerant or less, or motors of 1 hp or less

Before you rely on that list

The IBC is stricter. Under the International Building Code, which covers buildings outside the IRC, a shed or playhouse is exempt only up to 120 sq ft, and the fence exemption excludes pool barriers IBC 105.2.

Exempt from the permit is not exempt from the code. The work still has to comply, and so do zoning and other local ordinances R105.2.

Your city’s version is the one that counts. Each jurisdiction adopts a code edition and can amend it. Check the building department’s website or ask the permit counter.

Ordinary repairs need no application, but the line is tight. Cutting away a wall, cutting or removing a beam or bearing support, changing a required exit, or adding, altering, replacing or moving piping, wiring or mechanical work is not an ordinary repair R105.2.2.

If a water heater fails on a Saturday and you replace it that day, the application is due the next working business day R105.2.1.

What the application asks for

The model code wording is the same in the IRC and the IBC. The application goes on the department’s own form, and it must R105.3 IBC 105.3:

  1. Identify and describe the work.
  2. Describe the land by legal description, street address or similar description that definitely locates the work.
  3. Indicate the use and occupancy the work is for.
  4. Come with construction documents (plans) and other information the code requires.
  5. State the valuation of the work.
  6. Be signed by the applicant or the applicant’s authorized agent.
  7. Give any other data the building official asks for.

Item 7 is where building permit application forms get long. Broward County’s countywide uniform application, revised in January 2026, shows how far it goes Broward form:

  • One trade per application: building, electrical, plumbing, mechanical or other
  • Whether a private provider is used, and whether the fee owner authorized that in writing
  • Job address, tax folio number, flood zone, base flood elevation, floor area and job value
  • Building use, construction type and occupancy group; present and proposed use
  • Description of work, and new, addition, repair, alteration, demolition or revision
  • Legal description, or an attachment
  • Property owner, contracting company, qualifier and license number (or owner-builder, or a license exemption with a business tax receipt number)
  • Architect or engineer, bonding company, fee simple titleholder if not the owner, mortgage lender
  • Two sworn signatures, one for the owner or agent and one for the qualifier or agent, each with its own notary block

Your department’s form will look different. Our worksheet has a box for each of those facts, plus the trade details that electrical, plumbing and mechanical applications ask for: service size, fixture count, equipment tonnage, gas appliance BTUs.

Where applications get stuck

01

The parcel number

Counties name it differently. Florida forms call it the tax folio number. Los Angeles County calls it the AIN or APN (the same number, 4, 3 and 3 digits) and prints it on the tax bill and the deed LA County FAQ. Copy it from the tax bill or the assessor’s site. A transposed digit can point at someone else’s lot.

02

The legal description

The model code accepts a street address or similar description IRC R105.3, but some forms still have a legal description box (Broward’s does), and Florida’s statutory application and notice of commencement both ask for it 713.135(7)(a) 713.13(1)(a). Copy lot, block, subdivision and plat book and page from the recorded deed, word for word.

03

The valuation

It is the total value of the work, materials and labor, including electrical, gas, mechanical and plumbing equipment and permanent systems. If the building official thinks it is low, the permit is denied unless you can show detailed estimates, and the official can adjust it for fees IBC 109.3. If your trades file separate permits, ask whether each one wants its own trade value or the job total.

04

License numbers, and which ones

Expect more than one. Florida’s statutory form has lines for the contractor’s state certification or registration number and a local certificate of competency number 713.135(7)(a). Broward’s form calls the license holder the qualifier and gives the qualifier (or an agent) a separate notarized signature line Broward form. Check the expiry date before you file.

05

Owner or agent?

The code lets the owner or the owner’s authorized agent apply R105.1, and each department decides what proof it wants. La Habra, California rejects authorization letters that are not notarized La Habra. Los Angeles County, on its form for an agent applying for an owner-builder permit, verifies the owner’s signature with a driver’s license copy, a notarization or other verification LA County form.

06

Notarization

Florida’s statutory form has the owner or agent and the contractor each sign before a notary. Departments that take applications electronically can use a signed statement "under penalty of perjury" instead 713.135(7)(b). Outside Florida, it depends entirely on the department.

07

Flood zone, occupancy, construction type

Look up the flood zone and base flood elevation by address in FEMA’s Flood Map Service Center. A one- or two-family house is Group R-3 IBC 310.4; garages, carports and sheds are Group U 312.1. Construction type runs from I to V IBC 602. If an architect or engineer drew the plans, copy both from the drawings rather than guessing.

08

One trade, one application

Broward’s form takes one trade at a time, and Florida’s statutory certification says a separate permit is needed for electrical work, plumbing, signs, wells, pools, furnaces, boilers, heaters, tanks and air conditioners 713.135(7)(a). A kitchen with new circuits and a moved sink can mean three applications with the same owner and contractor blocks.

Florida: the statutory form and the notice of commencement

Florida writes the permit application into its statutes. Section 713.135(7) says the application "must be in substantially the following form" and prints it: tax folio number, owner, fee simple titleholder, contractor, job address, legal description, bonding company, architect or engineer and mortgage lender, then a certification, the owner’s affidavit, notarized signatures of the owner or agent and of the contractor, and the contractor’s state and local license numbers 713.135(7)(a). Every application must at least carry the owner’s and contractor’s names and addresses and a description that identifies the property 713.135(5).

Notice of commencement

  • The owner records it with the clerk before work starts and posts a certified copy, or a notarized statement that it was filed plus a copy, at the job 713.13(1)(a). It lists the legal description, street address and tax folio number, the owner’s interest, the contractor, any surety and lender, and a person in Florida who can receive notices.
  • Only the owner signs it: "no one else may be permitted to sign in his or her stead" 713.13(1)(g). An owner authorization letter does not change that.
  • The building department cannot make a recorded notice a condition of issuing the permit. When the direct contract is over $5,000, it needs a copy before the first inspection and will not do later inspections without one 713.135(1)(e)-(f). That subsection does not apply to repairing or replacing an existing heating or air-conditioning system for less than $15,000.
  • Jobs with a direct contract of $2,500 or less are exempt from most of the lien law 713.02(5). A notice is void if work does not start within 90 days of recording 713.13(2), and it expires 1 year after recording unless it states another date 713.13(1)(d).

Two more Florida rules contractors run into

Workers’ comp. An employer must show proof of coverage every time it applies for a building permit: a certificate from the carrier, an exemption certificate, or its authority to self-insure 440.103.

Owner-builders. The owner must personally appear and sign the application, and the department hands over a disclosure statement explaining the owner’s obligations 489.103(7). An agent cannot do it for them, apart from certain solar projects.

Fill your department’s PDF online

  1. Download the application from your building department’s website. Make sure it is the current revision: the current Broward form is marked revised 01-08-2026, effective 03-09-2026.
  2. Upload it here. Fillable, flat, or a scan of the paper form: JustFill finds the boxes and checkboxes on the page, so a PDF with no form fields works too.
  3. Paste the job details, from our worksheet, an email or your estimate. The values go into the matching boxes. Check each one against the form, especially the parcel number and license numbers.
  4. Download the filled PDF. Your first clean download is free.
  5. Sign, get it notarized if the form asks, and submit it the way your department accepts. JustFill fills the form. It does not file permits or check your plans against the code.

By uploading, you confirm you have the legal right to use this document.

Save your contractor block once

A remodel can mean a building, electrical, gas, mechanical and plumbing application for the same address, often filed the same day. On a set like that, the contractor details repeat on every form: legal name, address, qualifier, license number and expiry, local registration, workers’ comp and liability carriers, the permit runner’s phone. Only the job changes.

  1. Open your city’s form in JustFill and fill only the parts that never change: the contractor block, your permit contact, your insurance.
  2. Click Save as template. The field positions and those values are saved together.
  3. Next time you open the same PDF, JustFill offers the saved template. Your company block is already filled; add the owner, address, scope and valuation, check, and download.
  • If your city uses one form for every trade, as Broward does, one template covers all of them. If each trade has its own PDF, save one template per PDF.
  • A template belongs to that exact file. When the department issues a new revision, open the new PDF and save a new template.
  • Owner-builders can do the same with the owner block.

Other paperwork repeats the same way. Supply houses want a credit application with the same company details; see our commercial credit application guide.

When you apply for the owner

Some departments have their own form for this, such as Grass Valley, California’s agent authorization letter. If yours does, use it. If it just asks for a letter from the owner, ours covers what those forms ask for: the property and parcel number, the owner, the agent, the work, a signature and a notary block. The other direction, a license holder naming the employees who may sign for and pick up permits under the license, is a separate document, such as Largo, Florida’s contractor letter of authorization.

Owner authorization to obtain permits

One page. The property and parcel number, the owner (with a box for an LLC or trust, and a reminder to attach proof that the signer can sign for it), the contractor or permit service, what the agent may do (apply and sign, pay fees, pick up permits, schedule inspections, submit revisions), which permits it covers, and how long it lasts. The notary block is optional: use it when your department wants the owner’s signature notarized, or let the notary attach their own certificate.

Download blank PDF

Questions contractors ask

Sources

General information, not legal advice. Your building department’s adopted code, local amendments and forms are what count, so check with it before you file. Model code text checked against the 2024 IRC and IBC on the ICC’s public viewer, and Florida law against the 2026 Florida Statutes, on September 22, 2026.